Hello.
Thank you for your reply.
I don’t believe this task has any such constraint. You can see the Constraint Type column is As Soon As Possible.
What other fields should I check?
Thanks
PS. The post title is wrong, it is Finish to Start predecessor connection type, as shown in the image.