ProjectLibre Academy · Portfolio, Project & Views

Dashboard

The Dashboard, ProjectLibre's portfolio KPI hub: compare projects in a grid of charts and tune each widget's metrics.

Tagline: Portfolio KPI hub — high-level project intelligence across many projects, not a single-project Gantt.

ProjectLibre’s Dashboard is the central hub for high-level project intelligence and KPIs. A dynamic widget grid (demo: 2×2) lets you compare portfolio projects with complementary chart types, then tune each widget’s metrics.

See also: Navigation & Main Views · Portfolio · Gantt Chart · Network Diagram · WBS · Field Configuration · Creating a New Project.

Watch: Dashboard overview (~0:54).

Portfolio KPI / project-intelligence hub

Unlike task-level Spreadsheet or Gantt views, Dashboard is for strategic oversight across the portfolio. Same projects appear on multiple widgets with consistent color legends so you can cross-read cost-like figures, bubble axes, donut rings, and bars.

Dashboard opening hub with sidebar Dashboard selected Left nav Dashboard — central KPI hub — from Dashboard overview

Dashboard 2x2 widget grid overview Default demo layout — 2×2 widget grid — from Dashboard overview

Widget chrome — drag, gear, chart type, remove

Each card header includes:

  • Drag handle (six dots) — rearrange widgets.

  • Gear — opens Configure Columns / settings.

  • Chart type control (tooltip Chart type) — change the visualization.

  • Red X — remove the widget.

Header also shows global + Create and a filter (funnel) — present but not opened in this video (create flow belongs in Creating a New Project).

Dashboard widget drag gear chart-type and close controls Widget chrome — drag · gear · chart type · close — from Dashboard overview

Dashboard header Create and filter controls Dashboard header — + Create + filter (not opened in this clip) — from Dashboard overview

Demo 2×2 contents (same portfolio projects, consistent colors):

Position Chart type (UI) Notes
Top-left Pie Chart Slice labels + large numeric values
Top-right Bubble Chart X/Y + size; project color legend
Bottom-left Donut Chart Ring; may bind different fields than pie
Bottom-right Vertical bar family Matches Vertical Grouped / bar family

Four dashboard chart types Pie Bubble Donut Bar Pie · Bubble · Donut · Bar on one portfolio — from Dashboard overview

Chart types — Bars, Circular, Other

  1. On a widget header, click the chart-type control (tooltip: Chart type).

  2. Menu groups: Bars — Vertical Grouped | Vertical Stacked | Horizontal Grouped; Circular — Pie Chart | Donut Chart; Other — Bubble Chart.

  3. Select a type (Vertical Stacked); widget redraws.

  4. Switch back to Donut Chart (or another type) as needed.

Chart type menu Bars Circular Other groups Chart type menu — Bars / Circular / Other — from Dashboard overview

Chart type Vertical Stacked highlighted Vertical Stacked in the Bars group — from Dashboard overview

Donut Chart restored after type change Back to Donut Chart after experimenting with bar types — from Dashboard overview

Configure Columns — Active vs Available

  1. Widget header gear → Configure Columns.

  2. Modal chrome: title Configure Columns -; Search fields…; Expand All / Collapse All; Group by: Group | Type.

  3. Left: Available Fields (drag to add) — folder Main with fields such as start, finish, id, duration, percentComplete, work, cost, benefit.

  4. Right: Active Columns (drag to reorder) — badge count; demo starts with remainingWork, name (badge 2).

  5. Add percentComplete → badge 3; Active: remainingWork, name, percentComplete.

  6. Close (X) to return to the dashboard.

Different widgets can bind different Active fields — pie vs donut numbers can disagree for the same project until you align metrics. Same Active/Available pattern as Field Configuration / Gantt Field Configuration.

Configure Columns modal Available and Active Configure Columns — Available Fields vs Active Columns — from Dashboard overview

Adding percentComplete to Active Columns Add percentComplete from Available → Active — from Dashboard overview

Active Columns badge showing 3 fields Active Columns badge 3 after adding percentComplete — from Dashboard overview

Layout Grids — 2×2 / 3×2 / 2×1

Selectable layouts: 2×2 (current demo), 3×2, and 2×1 (“you can select that”).

Dashboard 2x2 while layout options narrated Dashboard layout — 2×2 view with 3×2 and 2×1 options

Dashboard sits above Portfolio, Project ▸ Gantt | Network | WBS, Resources, and Administration. Use it to answer “where am I?” before diving into a single project. Deep schedule work: Gantt · Network · WBS.

Sidebar Project accordion Gantt Network WBS from Dashboard Nav context — Project ▸ Gantt / Network / WBS visible from Dashboard — from Dashboard overview

Watch the Dashboard overview

Watch: Dashboard overview (~0:54) — hub intro, 2×2 tour, Chart type, Configure Columns (percentComplete), closing KPI line.

Final 2x2 Dashboard after configuration Final 2×2 Dashboard — high-level KPIs and project intelligence — from Dashboard overview